Customization: | Available |
---|---|
Application: | Food, Machinery & Hardware, Alcohol |
Packaging: | Film |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | LBL-150 |
Speed | MAX 150BPM |
Main machine size | 1000*860*1800 L*W*H (mm) |
Machine body & weight | Stainless steel 304, 500kgs around |
Electric power | AC3-PHASE 220V/380V |
Input power of machine | 2.5KW |
Applicable diameter of bottle | φ25mm -φ125mm |
Bottle height | Max 350mm, special can be designed |
Height of shrink label | 25 mm ~280mm,special can be designed |
Thickness of shrink label | 0.035 mm~0.13 mm(PVC ,PET ,OPS) |
Paper inner core | 5"~10" Free adjustment |
Shrink tunnel | Electrical / steam |
No. | Production line category | Capacity |
1 | Hot filling production line | 3, 000-36, 000BPH |
2 | Beverage processing System | 1, 000 Ltrs/H to 10, 000 Ltrs/H |
3 | Bottled water production line | 3, 000-36, 000BPH |
4 | 5L Large capacity bottled water production line | 700-5, 000BPH |
5 | Carbonated drink production line | 3, 000-18, 000BPH |
6 | Pulp juice production line | 5, 000-22, 000BPH |
7 | Oil Filling line | 3, 000-10, 000BPH |
8 | Linear Filling machine | 300-900BPH |
9 | Bottlle Unscrambler | Up to 20, 000BPH |
10 | 3/5 Gallon water production line | 300-2000 bucket/H |
11 | Water Treatment system | 1, 000 Ltrs/H to 10, 000 Ltrs/H |
12 | OPP Labeling machine | 6, 000-24, 000BPH |
13 | PVC Shrink Sleeve Labeling machine | 6, 000-24, 000BPH |
14 | Automatic Blow molding machine | 1, 000-7, 000BPH |
15 | Full-automatic Film Wrapper & Shrinker | 8-20packs per minutes |
Q1: Are you a trading company or a manufacturer?
A: We are a manufacturer, we supply the factory price with good quality, welcome to visit.
Q2: What's your guarantee or the warranty of the quality if we buy your machines?
A: We offer you the high quality machines with one year guarantee and supply long life technical support.
Q3: When can I get my machines after I paid?
A: The delivery time is based on the exact machine you confirmed.
Q4: How can I install my machines when they arrive?
A: We will send our engineers to your factory to install the machines and train your staffs how to operate
The machines.
Q5: How about the spare parts?
A: After we deal with all the things, we will offer you a spare parts list for you refer.