Customization: | Available |
---|---|
Certification: | ISO9001, CE |
Salt Rejection Rate: | 99.5% |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Volume of output water | External dimension | Power |
RO-500 | 0.5T/h(25°C) | 1500*850*1800 | 1.5KW |
RO-750 | 0.75T/h(25°C) | 1650*900*1800 | 1.5KW |
RO-1000 | 1T/h(25°C) | 1500*1000*1800 | 1.5KW |
RO-2000 | 2T/h(25°C) | 2500*650*1700 | 3KW |
RO-3000 | 3 T/h(25°C) | 3500*850*1700 | 4KW |
RO-4000 | 4 T/h(25°C) | 3500*850*1700 | 5KW |
RO-5000 | 5T/h(25°C) | 3500*1000*1700 | 5.5 KW |
RO-6000 | 6T/h(25°C) | 3500*1000*1700 | 7KW |
RO-7000 | 7T/h(25°C) | 4500*1000*1800 | 9KW |
RO-8000 | 8T/h(25°C) | 4500*1000*1800 | 11 KW |
RO-9000 | 9T/h(25°C) | 5500*1000*1800 | 13 KW |
RO-10000 | 10T/h(25°C) | 5500*1000*1800 | 15KW |
RO-15000 | 15T/h(25°C) | 6500*1500*1800 | 18.5KW |
No. | Production line category | Capacity |
1 | Hot filling production line | 3,000-36,000BPH |
2 | Beverage processing System | 1,000 Ltrs/H to 10,000 Ltrs/H |
3 | Bottled water production line | 3,000-36,000BPH |
4 | 5L Large capacity bottled water production line | 700-5,000b/h |
5 | Carbonated drink production line | 3,000-18,000b/h |
6 | Pulp juice production line | 5,000-22,000BPH |
7 | Oil Filling line | 3,000-10,000BPH |
8 | Linear Filling machine | 300-900BPH |
9 | Bottlle Unscrambler | Up to 20,000BPH |
10 | Barrelled water production line | 300-2000 bucket/H |
11 | Water Treatment system | 1,000 Ltrs/H to 10,000 Ltrs/H |
12 | OPP Labeling machine | 6,000-24,000BPH |
13 | PVC Shrink Sleeve Labeling machine | 6,000-24,000bph |
14 | Automatic Blow molding machine | 1,000-7,000BPH |
15 | Full-automatic Film Wrapper & Shrinker |
Q1: Are you a trading company or a manufacturer?
A: We are a manufacturer, we supply the factory price with good quality, welcome to visit.
Q2: What's your guarantee or the warranty of the quality if we buy your machines?
A: We offer you the high quality machines with one year guarantee and supply long life technical support.
Q3: When can I get my machines after I paid?
A: The delivery time is based on the exact machine you confirmed.
Q4: How can I install my machines when they arrive?
A: We will send our engineers to your factory to install the machines and train your staffs how to operate
the machines.
Q5: How about the spare parts?
A: After we deal with all the things, we will offer you a spare parts list for you refer.